Featuring a number of environmental initiatives including a system that collects and stores rainwater for toilet flushing, the contract involves upgrading the existing pool hall and constructing a new entry incorporating reception, administration, café, gymnasium and a physiotherapy and massage treatment centre.
A series of roof louvres open to enable the air-conditioning system to be switched to circulation mode, minimising energy usage. Other major works include a new roof, total refurbishment of the main pool and plant, and construction of two new pools.
Scheduled for completion during the first quarter of 2007, the work is being staged to enable sections of the centre to remain open to the public throughout the construction period.