Completed projects

Client: Caulfield Grammar School
Location: 217 Glen Eira Road, East St Kilda
Budget: $5.1 million
Completion: 2010
Architect: John Gribble Architects
Structural: Keith Patrick & Associates
Services: BRT Consulting Engineers
Hydraulics: C R Knight & Associates

Caulfield Grammar School

A two-storey $5.1 million building, the steel-framed Year 7 Centre comprises six specialist learning areas with walls opening to break-out space, two large science and creative art laboratories, amenities and offices, and a glass-roofed terrace over an outdoor learning area.

The centre features a brick and Vitrapanel - durable, pre-coloured compressed-fibre cement sheet - facade with extensive double glazing.  Computer-controlled windows open at night to replace stale air within the building while heavy duty insulation in the walls and ceiling minimises energy consumption by limiting dependence on the air-conditioning system.

A 500,000-litre under-floor concrete tank stores rainwater captured from the expansive roof area for toilet flushing, garden irrigation and a pool to be constructed adjacent to the new building.