Melbourne Grammar SchoolDesigned by Peter Elliott Architects, the refurbishment of the LOTE and Drama Centre in the Luxton Building involves stripping out the first floor of the two-storey building and demolishing a concrete stairway which is replaced by a steel structure with a glazed canopy. |
|
|
|
Beth Rivkah Ladies CollegeThe new $3.8 million 3 level structure at Beth Rivkah Ladies College in East St Kilda is designed by Melbourne based architects McIldowie Partners. |
|
|
Caulfield Grammar School - Wheelers HillConstruction of a new $6.1 multi-purpose gymnasium complex including extensive landscaping works surrounding the project. |
|
|
McKinnon Secondary CollegeThe $4.7 million contract involved constructing a two-storey wing incorporating general teaching spaces, specific areas such as home economics, science laboratories, music and computer rooms, main administration and staff amenities. |
|
|
CAULFIELD GRAMMAR SCHOOL - YEAR 7 CENTREA two-story $5.2 million building, the steel-framed Year 7 Centre comprises six specialist learning areas with walls opening to breakout space, two large science and creative art laboratories, amenities and offices, and a glass roofed terrace over an outdoor learning centre. |
|
|
METHODIST LADIES COLLEGE - MULTI-PURPOSE BUILDING & SCIENCE PRECINCTA staged project involving upgrading the storm water system and constructing an 800 square-meter multi-purpose building in the college's science precinct.
|
|
|
Haileybury College Grenda Centre RedevelopmentThe $1.5 million refurbishment of the college's 50-metre swimming pool and amenities included removal of the existing finish to the pool to enable the entire pool to be filled. |
|
|
Kids on TulipThe three-level Kids on Tulip provides first-class facilities for up to 120 children ranging from babies to pre-schoolers. |
|
|
Sydenham Interactive Learning CentreLocated in the Watergardens Centre at Taylors Lakes, Sydenham Interactive Learning Centre plays a vital role in the community. |
|
|
Melbourne University Stage 1A BIO 21The project involved the fit-out of extremely complex laboratory spaces including highly serviced fume cupboards that are comparable with the world’s highest standards. |
|
|
Mt Waverley Secondary CollegeA two-storey building of 10 classrooms, administration area, lockers and student amenities block and science and IT laboratories replacing a wing destroyed by fire in 2003. |
|
|
Kilvington Grammar Music SchoolCovering an area of 1,200-square-mtres, the Music School incorporates numerous acoustic classrooms of varying sizes. |
![]() |
Victorian College of the ArtsThe design team of Minifie Nixon were awarded the contract after winning a competition for the design of the new Union Library building. |
|
|
Hume Global Learning CentreConstructed of reinforced concrete, steel, glazing and pre-cast panels, the two-storey, 4,000 square-metre Hume Global Learning Centre was designed to accommodate additional levels if required in the future. |
|
|
Firbank Girls Grammar SchoolA two-storey building consisting of science classrooms, laboratories, preparation and practical work areas, chemical storage room, greenhouse darkroom, teacher and student amenities. |